i_2

B.S.R. Group

B.S.R. Group project assessment  

Subject: Establishing security systems and structural supervision 

Starting date: 2011

Ending date: 2015

Location: Kinneret Street, Bnei Brak 

Project: B.S.R. 3+4 Towers in Bnei Brak 

Project manager: Mr. Yair Shtauber

Sector: Office towers

Client: B.S.R. Group 

Financial volume

NIS 3 million 

Project description

B.S.R. 3 towers is located in Bnei Brak’s new industrial area close to Hayarkon Park and the train station. These luxury towers were designed at the highest standards, with 35 floors in each tower that extend over a commercial floor and four underground parking levels.

 Installing an automatic fire-detection and extinguishing system

The structural-supervision system includes control and command structures on the electrical systems, an air-conditioning system and meter gauges for tenants. 

The control and command system incorporates 30 permanent cameras assigned to protect the site of the towers. 

Planning, installation and submission of an automatic fire-detection and fire-extinguishing system, as well as obtaining signal alarms from the structural-supervision system, which includes electrical, air-conditioning, and plumbing control mechanism. 

Technical specifications: 

Security systems:

An automatic fire-detection and fire-extinguishing system by Siemens. 

The structural-supervision system is manufactured by Beckoff 

2200 control points throughout the building. 

Communication links to different elements in the building. 

Over 1000 communication points. 

Chillers in LON/BECNET communication. 

SATEC in MODBUS communication. 

ELNET in MODBUS communication. 

Generator in MODBUS communication.